Override ATP when scheduling an SO line
Oracle Order Entry
12.2.8
When scheduling a SO line if the Override ATP check box is checked we realize that the schedule date will be accepted however it seem like the system is still running though the ATP checks. Is this true? Why would we see this behavior?
Thanks in advance