Override ATP when manually scheduling a SO
12.2.8
Truth be told this is in the OM discussions getting no traction. I am hoping that perhaps a GOP guru might see this here.
When scheduling a SO line if the Override ATP check box is checked we realize that the schedule date will be accepted however it seem like the system is still running though the ATP checks. Is this true? Why would we see this behavior?