Saving Plan Limit where FY & CY are different
HCM 9.2 Tools 8.59.19 Image 43
Wondering if anyone has two calendars ( FY & CY) defined in their system and are using FY to track the Saving Plan Limit and deduction code maximum and could share with us how the limit is being handled for those approaching the maximum?