Can a routing operation be setup with a WC from another Branch Plant?
JDE E1 9.2- Is there a method to establish a routing operation utilizing a work center situated in a branch plant separate from the main branch plant designated in the routing? If such a method exists, could you kindly furnish the specifics? Alternatively, if no such method is available, your guidance on the most effective approach would be greatly appreciated.
The necessity arises from one of the operations within the routing requiring execution by a work center located in a different branch plant, thereby necessitating accounting integration with a distinct G/L account. It's important to note that the work center in question belongs to another branch plant within the same corporate entity. Thanks.