EPM 11.2.13 to EPM 11.2.15 Essbase 21c Conversion
I’m currently in the process of upgrading our current DEV EPM 11.2.13 to EPM 11.2.15. I have some questions around the upgrade to Essbase 21c that I haven’t been able to track down and was hoping someone could point me in the right direction. My main concern is the disk space requirements of 3 times the cube size and which drive the server needs the free space. Our Essbase server at a high level is configured as follows:
Essbase server as follows:
C:\ Drive OS and other programs installed here.
E:\ Drive Oracle EPM system installed here.
F:\ Drive EssbaseServer with cubes and supporting artifacts…