Which P4210 version is used by Backorder Release Job R42118
When R42118 is ran, sometimes it splits line and creates a new line. Which P4210 is called by R42118 for the Add/Edits of the lines. There is no Processing Option for P4210 Version in R42118.
There is a Processing Option though in P42117 for P4210 Version.