Can we run actualize_all twice on the same ADOP patching cycle?
Hello everyone,
I'm preparing to replatform and upgrade our EBS R12.2.5 (DB and app) from Solaris SPARC 11 to OEL Linux 8.
I'm concern that our current actualize_all patching cycle won't remove the old edition objects as I'm still seeing a lot of Valid Stub Objects on the patch edition (V_20241005_0851).
From our past actualize_all, the Valid Stub Objects became 0 after actualize_all phase and this removed all old edition objects after full cleanup. But this time, the Valid Stub Objects still has 5197 objects after actualize_all and finalize full.
Is it possible to re-run the actualize_all ans finalize full before cutover?