Does Oracle Primavera Cloud Support the Use of Role Codes?

Having migrated for using P6 EPPM to Oracle Primavera Cloud (OPC), it appears that OPC does not support the use of Role Codes in the same way that P6 EPPM does?

P6 EPPM allows Resource Assignments Layout to be be grouped and filtered using a Role Codes assigned to the Roles. However the equivalent in OPC, Assignments View, does not. Although codes can be created which can be applied to "Resources/Roles", the assignment of the a code value to Role does support the same functionality as a "Role Code" in P6 EPPM.