How to turn on? R31410: Warehouse Mgt, #3 Staging Location.
Hello,
We want to have a consistent single location for our "work order parts list"
We know that our P3109 calls the "wo parts list" P3111. When we do a "BOM Copy" we always get the default "Item primary location".
We want to use a secondary location. Not the primary location.
We want to control this "single secondary location" in the "Order Processing" R31410: Process Option: tab = Warehouse Mgt., #3 Staging Location.
On my test version for R31410, I set the process option for "Staging Location" = BF.ASSEMBLY. Then I run this against one "rate schedule / work order".
Results: from the P3109, goto the P3111 "wo parts list". We do not get our components location = BF.ASSEMBLY.