About Running Pre-Check Report In ODA Patching
Hi All,
We are using ODA X9-2 HA and going to apply patch 19.25.
In the FAQ part of 19.25 document (https://docs.oracle.com/en/engineered-systems/oracle-database-appliance/19.25/cmtrx/faqs-patching-oracle-database-appliance.html), it is mentioned that "It is strongly recommended that you run patching prechecks in advance, outside the patching or maintenance window, and take corrective actions for precheck failures proactively."
We usually tried to run the pre-check for BM server patch in advance. By reading the instruction mentioned above, I'm just wondering if anyone has tried to run all the pre-check (BM server, BM storage, DBS server, DBS database, etc) in advance especially the pre-check for DBS when BM is not patched yet.