Budgeting by CAP
Using PeopleTools 8.61, FS/SCM 9.2.052
PeopleBooks (Integrating with Budgeting) indicates you can integrate CAP and Assets with Budgeting. Is there a way to use the CAP to drive budget checking?
Example:
CAP ABCDE created with a limit of 5000
User enters a Requisition with a line with a distribution for CAP ABCDE for 10000
During budget checking (commitment control) we'd want this to be flagged as an exception. It's not an asset YET but the line would be if it goes all the way through the process.