Request for Additional Posting Edit Code in PCM
Regarding the “Posting Edit Code” in the Project Cost Management module, would it be possible to create an additional code that functions similarly to “N”? I’d like to distinguish between AFEs that are forced close (i.e., transactions can no longer be posted or entered in JDE but without a closure form) and those that are formally closed (i.e., AFEs closed with a closure form). This added distinction would help improve tracking and reporting accuracy.