MRP Using Inactive BOM/Router Batch Size

We have discontinued a batch size and have end dated the router and the bill of material for that lot size. Additionally, we've modified our Item Branch setup to utilize this new lot size (OPC = 1; Minimum order Qty = new lot size; multiple order quantity = new lot size). However, MRP continues to utilize the old lot size in the calculations. What are we missing?