Hi,

We need to restart E1 for a 10-hour window, but when I start it I understand that many sched jobs will be launched at the same time, that is, those that were accumulated during the 10-hour window.

How to start the best-performing sched?

Do I stop the sched server from the app?
Do I set all sched jobs to 02?
Do I set the E1 sched option "auto start = 0"?

When starting, how can I gradually free up the sched jobs?

thanks in advance