How Much time Needed to Complete FPO?
Hi
We have 1 FPO. We set the planned start date. I think Oracle generate the planned completion date based on planned start + X. X is the time needed to complete the FPO. How to calculate X? We want to verified that our calculation and Oracle calculation is same.
Thank you