Oracle Primavera EPPM Installation Error dbsetup.bat file in Windows

in Primavera (MOSC) 1 commentAnswered

I am trying to install Primavera P6 EPPM and connect it with Microsoft SQL Server inside a VirtualBox Windows 7 environment. However, the .bat file is not running during the installation process.

Environment:

  • Windows 11
  • Microsoft SQL Server (latest supported version)
  • Primavera P6 EPPM installer

Issue:

The Primavera installation BAT file does not execute, even when I try to run it as Administrator. Because of this, the database configuration does not proceed.

Solutions I Already Tried:

  1. Ran the BAT file as Administrator (right-click → Run as Admin).
  2. Tested with different versions of Primavera EPPM.
  3. Tried on other software environments (outside VM), still facing the same issue.

Howdy, Stranger!

Log In

To view full details, sign in to My Oracle Support Community.

Register

Don't have a My Oracle Support Community account? Click here to get started.

Category Leaderboard

Top contributors this month

New to My Oracle Support Community? Visit our Welcome Center

MOSC Help Center