ldm hw migration t7 t8
Hi,
I need to migrate from sparc t-7 to t-8 where there is a control domain a secondary domain and 4 ldom guest.
I think:
- on t-7 →ldm ls-constrains -x >guest.xml
- on t-8 i find the wwpn of every hba port
- on fc switch zoning wwpn with wwpn from SAN
- on t-8 ldm init-system -i guest.xml and ldm add-config
on t-8 configure the network. - the mpgroup will be automatically configured
Please give me your opinion.
0