Inventory Cost Level 2 - Change to 1

Hello,

We are facing an issue with the batch R41815 – Item Cost Level Conversion in our JD Edwards 9.1

We created a new item (Item No: TEST ) with the following configuration:

  • Cost Level: 2 (By Branch/Plant)
  • Cost Method: 02 – Weighted Average Cost (PMP)
  • Manual costs entered in F4105:
    • Branch 0101 → PMP = 111
    • Branch 0102 → PMP = 222

processing Option

When we run the R41815 UBE, the system returns the following message:

“Conversion at this cost level is not possible – Item cost level processing failed.”