Inventory Cost Level 2 - Change to 1
Hello,
We are facing an issue with the batch R41815 – Item Cost Level Conversion in our JD Edwards 9.1
We created a new item (Item No: TEST ) with the following configuration:
- Cost Level: 2 (By Branch/Plant)
- Cost Method: 02 – Weighted Average Cost (PMP)
- Manual costs entered in F4105:
- Branch 0101 → PMP = 111
- Branch 0102 → PMP = 222
processing Option
When we run the R41815 UBE, the system returns the following message:
“Conversion at this cost level is not possible – Item cost level processing failed.”