Select open PO dist lines when adding to voucher.
When adding a PO to a voucher, PO distribution line 1 appears to be the default.
In a lot of instances that distribution line is closed. How do I select the distribution line that is opened and associate it to the voucher line. I do not see an option.
Thanks