Parallel Operations in a Manufacturing Work Order
Hi All
We are on Oracle EBS R12.2.14, and are on to implementing Discrete Manufacturing
We have a requirement to enable operations to be executed in parallel for a given routing
Ex., A routing with 4 operations - Op1, Op2, Op3, Op4
Op1 - Start of the Operation
Op2, Op3 - Intermediate Operations that can be performed parallelly
Op4 - End of the Operation
Are there OOB options in EBS R12.2.14 to enable this use-case-scenario?
Thanks in advance
Prashanth