Hi,
We have an DR with one sparc t8-2 on every site.The 2 sparc t8-2 are connected to each SAN on every site.
They want to move one SAN from one site on other place.
I think i should shutdown the both servers.Is this better with power off from solaris or shutdown on solaris and from ILOM stop /sys?Then is it recommended to remove the power cords from each server?
They will move the SAN.
Then power cord is plugged in.
Before is better to ldm add-spconfig and ldm set-spconfig this last configuration.
ldm list-constraints -x > /path/config_toate_ldoms.xml and ldm list-constraints -x ldg1 > /path/ldg1.xml