Discussions
Check out Oracle NetSuite upcoming events and conferences here
Now is the time to ask your NetSuite-savvy friends and colleagues to join the NetSuite Support Community! Refer now! Click here to watch and learn more!
Attention: Customers with NetSuite Electronic Bank Payment (EBP) SuiteApp, version 2020.2 QA (ID 315896) must UPDATE (do NOT uninstall) their bundle to the Production version 2022.1 (ID 416781) by December 31, 2022. Note: If users fail to manually update the Electronic Bank Payments SuiteApp within the given time window, this version of the SuiteApp (ID: 315896) will be deprecated and the account will not be updated to Leading version (2022.1) of the Electronic Bank Payments SuiteApp. Please refer to the campaign email sent to impacted customers for more information.
Expand your NetSuite knowledge by joining our Ask A Guru Live sessions. RSVP on this event now.
Update your Profile with your Support type to get your Support Type badge.
NetSuite Release 2023.1 is here! Download the release notes and post your questions in the new Release 2023.1 category.
Join the webinar and "Get the Most Out of NetSuite Inventory Management" on May 2, 2023 at 10 AM PST. Click on this link to register. Do not forget to RSVP on this page as well!
How to setup Outsourced Manufacturing for Assemblies?
Hi guru
we are wanting to do the following and stuck probably the limits on creating Assembly
Rice Bags as follows:
Rawmaterial Uom cost
Rice Bag Brand A Each 800
Rice Bag BRand B Each 900
Assembly
Rice Pack Brand A KG
Rice Pack Brand B KG
Packing charges (Outsourced Cost) Each bag of Rawmaterial = 100
BOM Revision
Assembly=Rice Pack Brand A
Primary Unit type = Weight
Primary Stock Unit = KG (could be any one of 2kg 5kg or 25kg)
Primary Sale Unit = KG
Primary Base Unit = KG
Components:
- Rice Bag Brand A
- Packing charges
During manufacturing the outsourced manufacturer repack the
RM= Rice Bag Brand A
0