Hi There
I have a parent assembly item of a product, 'P1234'. This contains components such as a bottle, cream, lid.
It is outsourced manufactured.
There is a child matrix item ('C456') which is the parent item + a label
For the BOM for the child item, in the components, do I need to specify in the components :
1 x P1234
1 x label
or
just the additional component that is needed for the child item?
i.e.
1 x label
Thanks