When a Work order is created from a Sales order, according to the documentation of NetSuite the 'Production End Date' should be set one day before the expected ship date of the Sales order when using 'Backwards Scheduling'.
Sales Order - The box in the Create WO column on the Items subtab for an item that uses the WIP multi-step production process is checked. A work order is generated for your assembly item. The production end date on the work order is set to one day before the expected ship date on the work order. If no expected ship date is entered, the production end date is set to the same day as the sales order date.
See SuiteAnswer ID 39096
One of our clients uses the setting 'Backwards Scheduling' but the expected logic is not applied.
For example:
- I create a Sales order with an Assembly Item (SO578)
- Expected Ship Date = 03-08-2021
- When the Sales order is approved, a Work Order is created (WO655)
- Scheduling Methode = Backward
- Production Start Date = 02-07-2021
- Production End Date = 02-07-2021
I would expected to see '02-08-2021' as an Production End Date.
Does anybody know what is configured wrong?