Do I need to make a separate outsource charge for each assembly or can I use a generic outsource charge and change as needed for each item. For instance I have a product that has 5 different aromas but the outsource fee is the same - can i make a outsource charge called Outsource Charge-xxx and just change the cost and/or descriptions as needed on the work order/bom