Discussions
Costed BOM SuiteApp - AVG Costing
Installed the SuiyeApp and ran the costed BOM for an average costed BOM. The SuiteApp is returning a value that is Less than the running average cost of the item that is on the Item Record. The delta is material enough to cause concern.
The Finished good item has increased over time due to raw material costs and labor overage. Any idea why the suiteApp is not reflecting the costing increase over time.
I have changed the filter from revision to the current date and there is a 10.00 delta on the cost. Any thoughts?