To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Manufacturing
Manufacturing
Discussion List
-
New Connected Equipment and Redwood Sessions for Manufacturing - June 2025Join one of these two sessions to learn the latest in Manufacturing: Oracle Fusion Cloud Manufacturing: update 25B - Part 2: Flow Manufacturing and Redwood User Experien…
-
Event: Oracle Cloud SCM Integration Playbook Series: Integration with ManufacturingDate & Time: October 16, 2024 07:00 AM to 8:00 AM Pacific Time The Oracle Cloud Supply Chain Integration Playbook Series continues with Manufacturing integration pattern… -
List of Customer Connect Training ReplaysSummary Quick access to all the Manufacturing Customer Connect Training Replays ContentWatch these replays to get more information about implementing your products. You … -
See the On Hand Balance in the Work Order Materials Tab, after the Open Quantity (Redwood)Summary: In the standard Manage Work Orders, when you Open a Work Order in the Operations Tab and Items you could see the list of all the items with the Required Quantit… -
How to Enable DFF at Report material transactionSummary: Content (please ensure you mask any confidential information): Hello Experts we would like to enable a DFF while performing material issue for a Work Order. Ple… -
Enhancing CTO Supply Orchestration for Internal-Org Work OrdersWe are currently implementing the CTO (Configure-to-Order) process and would like to customize our supply orchestration plan to fit our internal business requirements fo… -
Not able to default any values in Work Order details page using visual builder StudioI am trying to default the status field using Form rules and its not working. -
Redwood page not responding work orders (New)>supplier operation details > receiving detailsSummary: For a standard work order, I have navigated to receiving details of supplier operation details. After selecting the receipt row, redwood page is not responding … -
Oracle Visual Builder for Work center resource shift.Summary: I have two work centers with more than 500 resources, and I need to assign shifts to all of them. The CSV import functionality does not support uploading more t… -
E-Signature – No Task Configuration Available for Work Definition ManagementI am currently working on introducing Electronic Signatures and Electronic Records (ERES) for Work Definition approvals in Oracle Fusion Manufacturing. As part of this a… -
Backflush Failure When WO Date Matches Component Effective DateSummary: Has anyone encountered an issue in Work Execution during Work Order creation where the component is not included when the transaction date coincides with the ef… -
material status showing as "Active" in Miscellaneous transaction.Subinventory is set as Fully Activematerial status showing as "Active" in Miscellaneous Transaction ,even if we have set them as Fully active in the sub-inventory. -
WIP_VIEW_WS_ASSIGNED_OPERATORS_PRIV and WIP_PERFORM_DISPOSITION_REJECTS_PRIV access not as expectedSummary: We validated two privileges via isolated custom roles and observed that removing them does not restrict the corresponding UI functions: WIP_VIEW_WS_ASSIGNED_OPE… -
Import Genealogy for Production Items that are not present in InventorySummary: Clients want genealogy for products that have been sold to customer Content (please ensure you mask any confidential information): Our clients are truck manufac… -
What does this error code mean when updating standard operation attributes?We are getting this error when trying to update a resource on the standard operation (that was already existing) to not be scheduled. We have also faced this error when … -
why does wip supply subinventory on work center take precedence over the wip supply sub in PIMSummary: When we create new work definitions we have a supply subinventory set at the work center level which defaults as the supply subinventory for all components adde… -
Moved: Can i have a sample payload for "Create an access request" Rest APIThis discussion has been moved. -
Onhand driving negative eventhough there is onhand in another lot for WIP completion transactions.we have sent some wip completions from LMS they processed successfully but they drove the inventory negative even though there is onhand in different lot. Attaching scre… -
Error while invoking API to reschedule operationSummary: I am trying reschedule a work order operation using API, it is a discrete manufacturing work order. But keep getting an error. Content (please ensure you mask a… -
Executing Project Specific Flow SchedulesSummary: Executing Project Specific Flow Schedules Content (please ensure you mask any confidential information): Trying to complete Flow Schedules for a Project Specifi… -
Process Work Order Resource transactions using Rest API & Visual builderSummary: Hello , "I'm encountering difficulties using the REST API via Visual Builder to bulk upload resource transactions for a Process Manufacturing Work Order. I've s… -
Supplier Operation Exception Notification is sent based on which role?Summary: Content (please ensure you mask any confidential information): Supplier Operation Exception Notifications are sent based on which Role or Privilage? FYI: The ex… -
Update Serial number in Supplier Operations OSPSummary: Hi All, We have a scenario where only one Operation exist for OSP. We created Work Definition with one Operation for Type "Supplier" . All of our Items are Lot … -
Work Order Not Auto Completing when supplier operation added as last operationWhen OSP operation are added as last operation and FG and Components are Lot Controlled work order, Work order completion is not automated after OSP purchase order recei… -
Not able to view Requisition created via OSP WOHello, I have created an OSP work order. In SCO, I can see that the Purchase Requisition has been created successfully and I can also see the PR number, but I cannot fin… -
Outside Processing with Process ManufacturingHello all, We are currently using Process Manufacturing with Standard Costing. Each Work Definition has several Resources assigned. We are considering using Outside Proc… -
Where I can find the redwood deadlines module wiseSummary: Where I can find the redwood deadlines module wise Content (please ensure you mask any confidential information): I need to know which module will get mandatory… -
Unable to add OSP item in the Standard operationsWe are facing issue with adding OSP item to the standard operation of supplier type. The item is not coming in the list of values as per the below screenshot. I have che… -
How can I make the Mark as complete checkbox appear unchecked when starting an operation?Summary: Hello community, how can I make the “Mark as complete” checkbox appear unchecked when starting an operation on a workstation? The question arises because when t… -
Required to Reverse the work order output quantity in report output transaction UI.Hi, The requirement is that after completing the work order, the user wants to reverse the only output quantity. Example: my completed batch quantity is 1000 with 4 inpu… -
Is there a way to set overconsumption tolerance for work order operational items?Summary: I would like to know if there's anyway we can set overconsumption tolerance for WO operational items. Content (please ensure you mask any confidential informati… -
Grouping Operation and create Work definition operation based on grouping operationIs it possible to group operations, so that when you create a work definition you don't have to reassign the process sequence one by one, you just need to call the exist… -
Auto-populate updated WIP supply Subinventory on Work Definition from component items levelSummary: Is there a way to auto-populate WIP supply Subinventory on Work Definition components after WD is created and then supply subinventory updated later at items le…