To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Quality
Quality
Discussion List
-
Is there File Based Data Import option for inspection plan creation??Summary: we have requirement to load inspection plan Content (required): Looking for FBDI/AdFDI Version (include the version you are using, if applicable): 23b Code Snip…
-
Do we need to take a separate license for Fusion Quality Module.Summary Do we need to take a separate license for Fusion Quality Module.Content Hi, Do we need to take any separate License for Fusion Quality Module or it's license is …
-
How to add reason LOV's in "reject reason" during quality inspectionSummary: In fusion, 1) During work order execution (WO with quality inspection enabled) , how to add customised reason LOV's in "reject reason" during quality inspection…
-
Sampling plan for PO receiptSummary: Content (required): Hi, Our customer has a following requirement: PO Receipt quantity - **** kg. Inspection should be on 50% of the receipt quantity. Sample siz…
-
Terminate workflow using REST APISummary: Terminate workflow using REST API Content (required): I have more than 1000 objects. I want to terminate workflow for all these objects, Going to each one of th…
-
Security for Characteristics, Inspection Plan and LevelSummary:I have multiple organizations where every one as a different quality lab, so when i define a characteristics or inspection level or plan, i can see that all orga…
-
Quality Inspection During Shipping to Customer.Summary: Hi Team - We have a requirement to inspect the material before shipping it to customer. As of now there is no inspection plan availability of type either pickin…
-
Supervisor Approval in Quality WorkflowSummary: Need Insight on Supervisor Approval using BPM Worklist Content (required): We have requirement to add next status approver [Immediate Supervisor] based on the e…
-
REST API for Characteristic UOMSummary: Is there any REST API for Characteristic UOM in quality module Content (required): For Characteristic UOM creation in quality module Version (include the versio…
-
Quality with samples for raw material purchasing processSummary: Our customer receives samples of raw material to be tested and if the result of all quality test are accepted at this moment they can purchase it from this supp…
-
Queries for Quality Issue related relationships and workflow approversSummary: I am trying to build queries to get all the relationships and workflow approvers related to quality issues but i am getting only one of the multiple rows availa…
-
Quality for new productsSummary: We have a requirement, that we the customer receive an order for a new product design, they first make a sample and test it then if the quality test got accepte…
-
Can we Remove a Characteristic Value From deciding Disposition of an InspectionSummary: Hi - We are performing an adhoc inspection, Where a quality inspector is verifying various characteristic and finally it is up to the cognizance of the inspecto…
-
Shyam Ganesh Parthasarathi-Oracle 12 views 1 comment 0 points Most recent by Shyam Ganesh Parthasarathi-Oracle
-
Add value in 'Acceptance Quality Limit'Summary: Add value in 'Acceptance Quality Limit' f or sampling plan type 'ANZI / ASQCZ1.4'. Content (required): In Inspection level, we want to add value in 'Acceptance …
-
Date Data Type in Inspection CharacteristicsSummary: Unable to use Date Data type in Inspection Characteristics Content (required): We are required to use Date field in all our Quality Plans. Along with Date we us…
-
Quality of manufacturing processSummary: hi Expert In my organization in the inspection process the inspector should update some information about the testing(for example category of the test from List…
-
How to attach multiple Inspection Plans to same assembly item / Item category?Summary: How to attach multiple Inspection Plans to the same assembly item / Item category? Content (required): Have tried creating a Catalog for Quality Inspection Mana…
-
Quality Inspection Plan > Manage Action RulesSummary: Quality Inspection Plan > Manage Action Rules Content (required): Hi Team, When we create a Quality Inspection Plan, after specifying the characteristics, we ha…
-
Can We Customize the Email Notification Subject and BodySummary: Hi Team - The email which we receive based on Action Rule "Send a Notification", can we customize its subject and body? Any option available. I did an adhoc inv…
-
Legacy Quality Data MigrationSummary: Need suggestion in migrating Legacy Quality Inspection Results to cloud [Data Migration] Content (required):Quality Results data exists in EBS R12 and we need t…
-
Difference between Problem Report & Quality IssueHi Team - I need some clarification between Quality issue and Problem Report. Q1) What exactly is the difference between them and when we should raise what? Could you pl…
-
How i can Creating Quality Issue without enabling Inspection Plan for Receiving InspectionSummary: We have an requirement in which we business do not want to enable Inspection plan for receiving Inspection but when a user reject a PO under inspection system s…
-
How does the fixed count works in the Sampling Plan Type?Summary: I need to check only 15 pieces to release my inventory, so I set an Inspection Plan with an Inspection Level with this configuration; Sampling Plan Type: Fixed …
-
Quality Data Mass UploadSummary: Mass Upload of INSPECTION PLAN - WORK ORDER & INSPECTION CHARACTERISTICS The requirement is to mass upload below data for the Oracle Fusion Quality Management D…
-
Inspection Value Does not Match with Characteristic Specification but Still Inspection Should pass.Hi Team - We have a requirement, like the length of the finished Good should be between 200CM (minimum) to 300CM(Maximum). But when we manufactured the product sometimes…
-
Moved: Approval While Inspecting Work Order Operation?This discussion has been moved.
-
Is it possible to not have a target for a characteristic that is Character LOV in a inspection plan?Summary: At the time of inspection plan creation, we have a character based characteristic (Example Color), There is no rejection based on what color it is, it is being …
-
Ability to lock inspection while other user is actively working onSummary: we have a requirement where we need an ability to lock down the inspection plan while any active user is updating the inspection result in during In-line receiv…
-
First article Inspection for QualitySummary: Hi Team, We have requirement when we are purchasing the item first time from the supplier. Vendor documentation should assign to supplier so that supplier can g…