To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Quality
Quality
Discussion List
-
Add value in 'Acceptance Quality Limit'Summary: Add value in 'Acceptance Quality Limit' f or sampling plan type 'ANZI / ASQCZ1.4'. Content (required): In Inspection level, we want to add value in 'Acceptance …
-
Date Data Type in Inspection CharacteristicsSummary: Unable to use Date Data type in Inspection Characteristics Content (required): We are required to use Date field in all our Quality Plans. Along with Date we us…
-
Quality of manufacturing processSummary: hi Expert In my organization in the inspection process the inspector should update some information about the testing(for example category of the test from List…
-
How to attach multiple Inspection Plans to same assembly item / Item category?Summary: How to attach multiple Inspection Plans to the same assembly item / Item category? Content (required): Have tried creating a Catalog for Quality Inspection Mana…
-
Quality Inspection Plan > Manage Action RulesSummary: Quality Inspection Plan > Manage Action Rules Content (required): Hi Team, When we create a Quality Inspection Plan, after specifying the characteristics, we ha…
-
Can We Customize the Email Notification Subject and BodySummary: Hi Team - The email which we receive based on Action Rule "Send a Notification", can we customize its subject and body? Any option available. I did an adhoc inv…
-
Legacy Quality Data MigrationSummary: Need suggestion in migrating Legacy Quality Inspection Results to cloud [Data Migration] Content (required):Quality Results data exists in EBS R12 and we need t…
-
Difference between Problem Report & Quality IssueHi Team - I need some clarification between Quality issue and Problem Report. Q1) What exactly is the difference between them and when we should raise what? Could you pl…
-
How i can Creating Quality Issue without enabling Inspection Plan for Receiving InspectionSummary: We have an requirement in which we business do not want to enable Inspection plan for receiving Inspection but when a user reject a PO under inspection system s…
-
How does the fixed count works in the Sampling Plan Type?Summary: I need to check only 15 pieces to release my inventory, so I set an Inspection Plan with an Inspection Level with this configuration; Sampling Plan Type: Fixed …
-
Quality Data Mass UploadSummary: Mass Upload of INSPECTION PLAN - WORK ORDER & INSPECTION CHARACTERISTICS The requirement is to mass upload below data for the Oracle Fusion Quality Management D…
-
Inspection Value Does not Match with Characteristic Specification but Still Inspection Should pass.Hi Team - We have a requirement, like the length of the finished Good should be between 200CM (minimum) to 300CM(Maximum). But when we manufactured the product sometimes…
-
Moved: Approval While Inspecting Work Order Operation?This discussion has been moved.
-
Is it possible to not have a target for a characteristic that is Character LOV in a inspection plan?Summary: At the time of inspection plan creation, we have a character based characteristic (Example Color), There is no rejection based on what color it is, it is being …
-
Ability to lock inspection while other user is actively working onSummary: we have a requirement where we need an ability to lock down the inspection plan while any active user is updating the inspection result in during In-line receiv…
-
First article Inspection for QualitySummary: Hi Team, We have requirement when we are purchasing the item first time from the supplier. Vendor documentation should assign to supplier so that supplier can g…
-
Inspection should not be submitted for approval before results entered for all characteristicsSummary: While creating quality inspection, inspections are getting submitted for approval without entering results. Customer is not happy with this behavior. Results fo…
-
How to Create DFF in Inspection and Inspection Plan.Hello Team, In the Quality Management, for Inspection Table, Could anyone please let me know how to add DFF's or adding a field through Application Composer. Thank You, …
-
How to do a Quality Inspection randomlySummary: Currently, we are using quality inspection plan. But it allowing to inspection at certain Quantity or Percentage or whole the ordered quantity. Content (require…
-
More than one user should be able to populate the inspection results against one Inspection PlanSummary: Business requirement. 1. Create a inspection plan with 10 characteristics. Say 5 characteristics in Analytical lab and 5 in Micro-biological lab 2. Analytical l…
-
Approval workflow for an Inspection PlanSummary: I would like to implement an approval workflow to one inspection plan. Is it possible? The requirement is to notify some specific users into the receiving proce…
-
How to add DFFs In Inspections or Inspection PlansSummary: Hello Team, In the Quality Management, for Inspection Table, Could anyone please let me know how to add DFF's or adding a field through Application Composer. Th…
-
Certificate of Analysis report from Quality?Summary Has anyone created a Certificate of Analysis report from Quality?Content We are a Chemical Distribution company currently configuring Oracle Cloud ERP/SCM. We ar…
-
In Quality Module, Need single NCR to be created for single Inspection.Summary: In Quality Module, need single NCR to be created for a single Inspection. Currently, Multiple NCRs are getting created for each characteristic in a single Inspe…
-
Change Order Against a Quality Action.Summary: I created a quality action against a quality issue. The org on action and issue was stamped as ABC. While i am creating a change order against the action, i got…
-
How to create an Inspection Plan for a PO Receiving related at category level and not at item level?Summary: I need to activate an Inspection Plan for a specific item category. Is it possible? I tried to configure it, but the Inspection Plan was not triggered. (let see…
-
Enabling 2 nspection plans for singe PO receipt.Summary: As per requirement we need to enter quality results against 2 Inspection Plans for a single PO reciept for a particular Item. One Inspection plan with Level set…
-
Clarification on Esignature during inspection.Summary: E-signature is enabled for Receipt inspection disposition. I created a receipt of 10 Qty, Inspection done, Submit for approval. The Esignature page opens and ap…
-
Moved: How to restrict the rejected items in receiving options to be putaway in Goods Subinventory?This discussion has been moved.
-
REST API for Mass Update Inspection Plan (End Date one characteristics and Add new one)Summary: Content (required): Hello Experts Which API I should use in below situation? End Date one characteristics from Inspection Plan. Add a new characteristic to same…