To ensure that questions get required attention from community members and are NOT left unanswered, it’s important for the author to indicate (by selecting “Yes” or “No” when prompted) whether the question was answered. (newly added) Please note that it is also important to respond to EACH comment your question receives. Your Yes or No response ensures an accurate status for your question.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
For more information, please refer to this announcement explaining best practices for getting answers to questions.
Get Started with Redwood: Oracle Cloud SCM and Quality
Quality
Discussion List
-
Inspection should not be submitted for approval before results entered for all characteristicsSummary: While creating quality inspection, inspections are getting submitted for approval without entering results. Customer is not happy with this behavior. Results fo…
-
How to Create DFF in Inspection and Inspection Plan.Hello Team, In the Quality Management, for Inspection Table, Could anyone please let me know how to add DFF's or adding a field through Application Composer. Thank You, …
-
How to do a Quality Inspection randomlySummary: Currently, we are using quality inspection plan. But it allowing to inspection at certain Quantity or Percentage or whole the ordered quantity. Content (require…
-
More than one user should be able to populate the inspection results against one Inspection PlanSummary: Business requirement. 1. Create a inspection plan with 10 characteristics. Say 5 characteristics in Analytical lab and 5 in Micro-biological lab 2. Analytical l…
-
Approval workflow for an Inspection PlanSummary: I would like to implement an approval workflow to one inspection plan. Is it possible? The requirement is to notify some specific users into the receiving proce…
-
How to add DFFs In Inspections or Inspection PlansSummary: Hello Team, In the Quality Management, for Inspection Table, Could anyone please let me know how to add DFF's or adding a field through Application Composer. Th…
-
Certificate of Analysis report from Quality?Summary Has anyone created a Certificate of Analysis report from Quality?Content We are a Chemical Distribution company currently configuring Oracle Cloud ERP/SCM. We ar…
-
In Quality Module, Need single NCR to be created for single Inspection.Summary: In Quality Module, need single NCR to be created for a single Inspection. Currently, Multiple NCRs are getting created for each characteristic in a single Inspe…
-
Change Order Against a Quality Action.Summary: I created a quality action against a quality issue. The org on action and issue was stamped as ABC. While i am creating a change order against the action, i got…
-
How to create an Inspection Plan for a PO Receiving related at category level and not at item level?Summary: I need to activate an Inspection Plan for a specific item category. Is it possible? I tried to configure it, but the Inspection Plan was not triggered. (let see…
-
Enabling 2 nspection plans for singe PO receipt.Summary: As per requirement we need to enter quality results against 2 Inspection Plans for a single PO reciept for a particular Item. One Inspection plan with Level set…
-
Clarification on Esignature during inspection.Summary: E-signature is enabled for Receipt inspection disposition. I created a receipt of 10 Qty, Inspection done, Submit for approval. The Esignature page opens and ap…
-
Moved: How to restrict the rejected items in receiving options to be putaway in Goods Subinventory?This discussion has been moved.
-
REST API for Mass Update Inspection Plan (End Date one characteristics and Add new one)Summary: Content (required): Hello Experts Which API I should use in below situation? End Date one characteristics from Inspection Plan. Add a new characteristic to same…
-
Has anyone implemented First Article Inspection(FIA) in fusion Quality Management?Has anyone implemented First Article Inspection(FIA) in fusion Quality Management? Can you please guide on the necessary setup steps for this?
-
QM: Multiple Inspection Plan for 'Receiving'Summary: Hi Experts, If we have multiple Inspection plans created for an inventory org and quality inspection catalog, what is logic on which the system will pick the in…
-
Updated Course: Application Composer and Scripting!Summary: The Oracle SCM Cloud: Application Composer and Scripting course was recently updated and is now available with new content and examples about using REST webserv…
-
Impact Analysis in Problem ReportSummary: Need to understand the functionality of Impact Analysis in Problem Report Content (required): There is a tab in Problem Report as Impact Analysis. How is it use…
-
WIP Quality Inspection for a Sample of items having Serial Control enabledSummary: WIP Quality Inspection for a Sample of items having Serial Control enabled Content (required): Hello Experts, I am trying to run WIP Inspection plan for an Item…
-
Free Tutorial Videos!Summary: Find help using or configuring Quality Management through VideoHub tutorials. Content (required): Register on Oracle VideoHub and view basic and advanced tutori…
-
What is dispatch status in Quality Inspection plan and where we can use thisSummary: We could not search the "dispatch status" in any of the doc in details Content (required):We need to explain in details what is this "Dispatch status" mean and …
-
Ability to change inspection criteria based on specific purchase orderSummary: Is it possible to change inspection plan/criteria based on a specific PO number? use case- Generally a specific inspection plan/level is used for In-receiving i…
-
Can we change the Material status of all the Child Lots in a Parent LotSummary: We have Parent & Child Lot enabled in the Inventory. In Adhoc Inventory Inspection we are doing an inspection at the child lot level. If any of the characterist…
-
Moved: Send Notification to QA upon Completion of an Operation that precedes a Quality OperationThis discussion has been moved.
-
ANSI/ASQC Z1.4 Standard - Double Sampling Plan options not availableSummary: The Sampling Standard Code does not list the Double Sampling plan options. Is this option available but not enabled or does not exist. Content (required): The c…
-
Can Customer/Supplier initiate the inspection for QualitySummary: Is it possible to initiate the inspection by the customer/Supplier? Content (required): Is it possible to initiate the inspection by the customer/Supplier? If Y…
-
Business Process Model for qualitySummary: Is there a business process model for Quality Content (required): The document Oracle Fusion Business Process Models: Homepage (Doc ID 1542019.1) does not have …
-
Moved: Send Notification to Quality Team before moving items between SubinventoriesThis discussion has been moved.
-
Moved: If a lot at Receiving fails inspection, can we block invoicing?This discussion has been moved.
-
Inspection for lot with zero quantitySummary: Our client is in food process manufacturing and requires the functionality where we can record inspection for a lot even when there is no onhand quantity for th…