Bulk Load for Task Work Schedule Assignment Administration with Resource Type Job

edited May 17, 2018 9:27AM in Workforce Management 3 comments

Content

Dear Experts:

We are in need to have two different work schedules based on assignment category, since we do not have Resource Type as Assignment category to map work schedules to assignment, we have decided to do it based on Job, as we can segregate Jobs based on Job Function.

Challenge is we have ~3000 jobs in application and huge effort will be required to map the same. We are looking on the possibilities to load jobs in bulk, to achieve the requirement in one shot.

Please share your thoughts if something has been done in past from your end.