Can we Create single Maintenance Work Order for multiple Maintenance Assets with project and task?
Summary:
The business is required to create a single work order with multiple maintenance assets in it with the same project and task information. To do that we need to create this asset as a serial-controlled asset, a maintenance work order can be created with this functionality for multiple assets, Work order cost is recorded in the cost management. The issue is this cost is not able to be imported into the project costing. Is there any missing configuration from Maintenance?
Content (please ensure you mask any confidential information):
In 24C there is functionality in the Maintenance that can create a single work order for multiple assets, but this requires multiple pre-requisites, which is not aligned with business requirements.