How to design the requirement of manufacturing in another WC from Existing WD/WO operation WC
Summary:
While executing the work order with 3 operations. In the 2nd operation if the resource is not available then business wants to move this to another work center which will have the required resource to manufacture the product.
Currently we can define & provide alternate resource within the same work center.
Is there a way where we can move it to another work center and manufacture the finish good/product ?
Regards
Manjunath D