OTM Shipment from EBS with 3 Stops: Cost Calculation Ignores Middle Stop
I have a SAW Shipment with three stops in the sequence A > B > C. OTM calculates the cost only for the full route A > C and does not consider B as a separate leg.
Since the shipment is coming from EBS, we are not using an itinerary in OTM.
How can we make OTM calculate the costs for both A > B and A > C individually. Is there a way to split or adjust the cost calculation accordingly.
Regards
0