Cumulative Manufacturing Lead time attribute is not getting updated in PIM Lead Time attributes
Summary:
We ran the ESS job:
Calculate Lead Times and Roll Up Cumulative Lead Times
It has completed and verified the o/p file. The Fixed and Vrable LT calculated is correct as per Work definition.
So, no issues in Calculation logic. The issue is the Item attributes for LT (specifically Processing LT, Variable LT) in PIM are not getting updated in that Organization/Item for which we ran the job.
It should have updated the PIM attributes as calculated in the job.
Processing LT, Variable LT values are blank in PIM for that Org. Item. Are we missing any setups?