Network legs order routing
Summary:
We have a scenario for some of the OD pair (A—>C) the network routing from origin to destination is higher cost compared to routing (A —→ B —→ C) is cheaper with an extra leg (A—>B).
And we have the rate configured as region to region where the regions will have locations (A, B, C). The network is configured in a way where we have legs from A —> C, B —> C and A—> C are all valid.
Is there an option to let the orders plan the routing as A—>C irrespective of the higher cost?
Thanks,