Can we model the scenario to create maintenance WO using absolute meter reading w/o considering avg?
Summary:
We have a business scenario, where number of parts run through a machine (throughput) is being measured on milling machines. Business wants a work order to be created every time the meter reading increments by a certain value, and not based on the calculated daily average utilization rate.
There isn't a need for a forecast, but a released work order to be created.
Can this scenario be modeled in Oracle cloud maintenance using out of the box features?
For ex: For every 10,000 parts run through the machine, we need one maintenance work order.
Day 1 Reading 5000 (No work order)
Day 2 Reading 10000 (Work order created)