Work Order material consumption across task in Project based SCM Manufacturing
Summary:
Requirement to consume items on Work order from different task apart from the Work Order task . (WO header task : Project A task 1, inventory available under Project A task 2, same sub inventory and locator) While completing WO operation the reservation does not consider material availability in Project A task 2, rather shows material unavailable.
Content (please ensure you mask any confidential information):
Have tried using HARD pegging at Project level along with use common inventory check box as yes.
Manual Material reservation does not consider reserving material from a different task.
Apart from doing Project transfer for each project and task ( >500 transactions/day) looking for a work around in such case where either while checking the required qty of Work order operation material is consumed from a common task , or to use a API to trigger project transfer if material is not available on-hand for work order task.