25C calendar scheduling logic changes? Scheduling problems
Summary:
Every update brings a new challenge, the calendar schedule is a mess.
With the 25C update, something seems to have changed in the calendar schedule calculation for work requirements.
a 6 monthly cycle Work Requirement that was correctly producing a work order on 1 December 2024 and then on 1 June 2025, has now suddenly produced a forecast for 1 October 2025 (instead of 1 December 2025).
No changes have been made to the work requirement.
Work requirement
Everything was working fine before 25C, Work Orders scheduling as expected every 6 months:
After 26C update the scheduling has now changed, instead of 1 December 2025:
What has changed in the way the forecast engine works in 25C?