Calculate Lead Times and Roll Up Cumulative Lead Times ends with error.
Summary:
I am trying to run the concurrent "Calculate Lead Times and Roll Up Cumulative Lead Times" for an item having the work definition with the production priority as 1, costing priority as 1 for the primary work definition. But the cumulative lead time value is not getting calculated.
Then concurrent txt files shows this error. Help me to identify the error.
Oracle Supply Chain Management Cloud - Manufacturing
Scheduled Process Information
Name: Manufacturing Lead Time and Cumulative Lead Time Calculation Report Process ID: 15740904 Scheduled Time: 3/4/2026 2:26 AM Pacific Standard Time
Scheduled Process Parameters
Scope: Calculate Manufacturing and Cumulative Lead Times Organization: 002 Item Catalog: Costing Catalog Item Range: Item ASSY_ITEM_1 to Item ASSY_ITEM_1 Item Categories: Finished Goods Planner: Calculation Date: 3/4/2026 12:00 AM Include ATO Model: No