Meter-Based Maintenance Forecast Not Considering Entered Meter Reading

Hi All,

I have created a meter-based maintenance requirement for an asset with a 30-hour interval. I entered a meter reading of 27 hours. After generating the forecast, the due date shows as 16-Nov-2026.

The forecast should use the entered meter reading. With 27 of the 30 hours already consumed, the due date should be much earlier. The entered meter reading does not appear to be considered in the forecast calculation.

Please suggest what is missed. Thanks in advance.

Regards,
Sachin