Integration
Discussion List
-
how to extract Integration period in EPM Agent using GroovySummary: I am trying to extract the period for which that integration has executed , Content (please ensure you mask any confidential information): Version (include the … -
Integrating EPM Planning Cloud with PostgreSQLSummary Blog Post - Integrating EPM Planning Cloud with PostgreSQLContent Hi, This post shows how to use EPM Agent to connect EPM Planning Cloud to a PostgreSQL database… -
Pre-built Integration between Fusion Fixed Assets and Oracle Planning Cloud Capital ModuleSummary Is Pre-built Integration between Fusion Fixed Assets and Oracle Planning Cloud Capital Module Available?Content Greetings, I am using Oracle Planning Cloud and w… -
Data workbench export to excel optionSummary: I tried to export workbench data to excel Content (please ensure you mask any confidential information): I have received a requirement from a user to export wor… -
Business Rule in Pipeline Executes Only for One Year Instead of All Years in RangeSummary: We configured a Data Integration pipeline to run over multiple years (e.g., FY23 to FY25) with a Business Rule job type that runs a Calculation Manager rule. Ac… -
Data Push from CAPEX to FS Cube is not workingSummary: Although I'm doing exactly the steps mentioned in the tutorial (https://docs.oracle.com/en/cloud/saas/planning-budgeting-cloud/capital-tutorial-integrating-fina… -
EPM Pipeline: Running a business rule with runtime prompt type SmartlistSummary: Hi, I'm trying to execute the BR: "OWP_Process Loaded Data" as part of a pipeline. I want to pass the variable "OEP_FcstMnth" as the RTP 'Month'. However, Month… -
Is there a way to automate Data Map Synchronization?Content Hi, We have some automated processes that update metadata in Planning, Load data to BSO and push it to Reporting ASO using Data Maps. But whenever metadata updat… -
Budget Revision without Budgetary ControlSummary: Need: identify which configuration to check that specifically looks for the integration with Budgetary Control Any whitepaper for setting up EPM Budget Revision… -
looking to connect Power BI to our EPM/Essbase dataWhat is needed to connect Power BI to our EPM/ESSBASE data? Do we need to setup a connection to ESSBASE or have a data source called ESSBASE? Is there any friendly docum… -
Role to Run Data Exchange/Data IntegrationsSummary: Would like to give a user the privilege to run integrations via Data Exchange. Content (please ensure you mask any confidential information): The role "Data Int… -
Use OAUTH for EPM GEN2 Rest APIs in OICSummary: Currently we are in EPM GEN2 and using basic authentication for EPM Rest apis in OIC. Customer wants to use oauth for the rest apis. I went through below docume… -
Can't find metadata for Type dimension in WorkBenchHello All, In the target Planning app, in DataExchange/DataManagement, connected with another source Planning app. Trying to take the data from source Planning app and W… -
Include Budget Entry Name when executing write-back integration to ERP Budgetary ControlSummary: As part of the update for Fusion ERP 24C there was a new requirement to include a value for the Budget Entry Name and Source Budget Name parameters in the budge… -
Is it possible to use @UDA function in source filter in DLR - EPBCSI would like to use @UDA function in source filter of DLR? Is it possible? If yes, can you please provide the detail info. -
Data Integrations are Missing in Data ExchangeSummary: Following the recent patch update(25.04.65), we are unable to see any of the existing data integrations in Data Exchange. However, these integrations are still … -
Data Load Rules Significantly Slower in Gen2 vs Gen1Summary: Data Integration load rules (from flat files or between applications) is significantly slower in Gen2 vs Gen1. Does anyone have any tips on how to fix this? Con… -
In the EPBCS Multi Currency application, is it possible to enable the Budgetary Revision?We already configured the muli currency EPBCS application. Now the user requested us to enable the budgetary revisions in that application. Is there any workaround for t… -
BegBalance data is getting loaded into Dec period even not run for itWe have a period mapping for BegBalance defined in global mapping (Period Key: 12/30/2025 - BegBalance-25) and Dec-25 as 12/31/2025 but when we run the integration to pu… -
Question on naming restrictionsSummary: Content (please ensure you mask any confidential information): Hi, Oracle has documented naming restrictions for member name/alias https://docs.oracle.com/en/cl… -
Account Hierarchy Sorting Issue During ERP to EPM IntegrationAbove is the issue identified during the integration of the Account Hierarchy from ERP to EPM. In ERP, the hierarchy is maintained in a specific (non-alphabetical) order… -
Like Mapping issue in fdmeeSummary: Like Mapping how to assign one to one mapping first then other source member linked to dummy member Content (please ensure you mask any confidential information… -
Passing Period from Pipeline STARTPERIOD variable to Business RuleSummary: How to pass period from pipeline variable $startperiod to business rule Content (please ensure you mask any confidential information): I have a pipeline that I … -
How to sum up same code combination record in Data ManagementHello Experts, Need advice on below issue, We are loading the all data type data via EPM agent to PBCS application. While load data, for similar combination as shown bel… -
Remove lines/entry from EPM integration loadI'm attempting to do something I thought was simple, but doesn't seem to be. I accidentally loaded some lines to Budgetary Control in ERP and need to remove them, but I … -
Using substitution variables in source filters in DLR in data managementSummary: Content (please ensure you mask any confidential information): Hi All, We are extracting forecast data from our planning application on a daily basis and sendin… -
Question on Mapping Based on Multiple Source Dimensions (ERP to EPM Planning)Dear Oracle Product Team, We are currently configuring data mapping settings for integration from Oracle ERP Cloud GL to Oracle EPM Cloud Planning. Below is the dimensio… -
Is there a way to audit the data that is uploaded through a data load rule or Data integrationHi, in reviewing the audit logs, we found that there is no logging of the data that is loaded through a data load rule or data integration, nor does the jobs show up in … -
BIP Report Integration with EPM having no parametersSummary: Hi guys, I am trying to do an integration of BIP Report with EPBCS application. Following the process, I have configured the target application as below. Since,… -
How to find last modified date of Integration FCC-ERP-UK-ACTUALHi All, We are not able to find last modified date of integration FCC-ERP-UK-ACTUAL in FCC prod application. Please share document's/steps to find last modified date of …Vijaya Kumar Mattala 31 views 2 comments 0 points Most recent by Ashutosh Bhatikar-Oracle Financial Consolidation and Close