Integration
Discussion List
-
FusionHcmAdapterFailed Error in HCM Integration within PlanningWe are getting an error when loading data from the HCM Assignment Extract into Planning. In PROD instance the data loads for other months have been successful; however, …
-
Independent BR assigned to Integration - runs also rules that are not assignedSummary: Hi all, I have created an Integration in EPM Planning (runs as expected) with the BR assigned to it. This business rule has been added as an Independent, event-…
-
Clearing Behaviour when Sending Budget Data from EPM Planning to ERPSummary: What is the Clearing Behavior when Sending Budget Data from EPM Planning to ERP General Ledger. (Not Budgetary Control) Content (please ensure you mask any conf…
-
Advanced Predictions failing at stage connecting to OCISummary: We are testing Advanced Predictions and are encountering job failure in the Pipeline connecting to OCI. We don't see any guidance in the documentation related t…
-
Merge data slice does not work in pipelineHi everyone, I am creating datapipeline for merging data slice epm platform job. However, it showed the error: My parameter here: What should I do next? Thanks and have …
-
Data in tdataseg gets clearedSummary: Hi , i had a question regarding tdataseg table used in data exchange in Oracle ARCS. Can anyone let me know if this tdataseg table gets cleared on daily basis d…
-
Metadata Integration between EPM Cloud ApplicationsSummary: How to integrate metadata between EPM Cloud Applications? How to transfer metadata files to other EPM applications? Content (required): Hi all, between two EPM …
-
Does CopyfromObjectStorage copy a file directly to a custom data management folderSummary: Content (please ensure you mask any confidential information): It seems currently there is no option in CopyfromObjectStorage epmautomate command to copy a file…
-
Best practice around loading data from HDFS to Oracle EPMHas anyone worked on pulling data from HDFS to Oracle EPM planning? Need to understand what are the best practices to integrate data from Hadoop File System to Planning.…
-
can we load Smartlist data from fusion and not through CSV file?Summary: can we load Smartlist data from fusion and not through CSV file? Content (required): I am trying to load smartlist data from fusion but I cannot see the option …
-
Smart Push & Data Map LimitsI was looking through the documentation and didn't see it explicitly called out anywhere, but I wanted to confirm the limits of pushing data via smart push & data maps: …
-
Data Integration with smart split QuerySummary: While checking the below latest release : "A new Smart Split feature is available in Data Integration when importing a large volume of data that exceeds Essbase…
-
How to connect / build reports against data integration schema?Summary: In Data Exchange, after loading we need to get some statistics on numer of records exported, sum/avg of these records, etc. In EPM Integration Agent documentati…
-
@XWRITE Smartlist with dynamic MembersSummary: Hi Y'all, I'm trying to basically recreate the Data Push from CAPEX to FS via Calc Script and now I'm at the stage where I want to transfer the Data stored in t…
-
Data Exchange - Create Application NOT Creating New ApplicationSummary: Not sure what I am supposed to do to create a Cloud ERP application, below is what I am trying for Category, Type, and Connection. Why does it not create a new …
-
Import Project Budget for incremental projectI've just adjusted my project budget amount and already updated performance project. I need to run import project budget in PBCS to update project budget amount in PBCS …
-
strategic modeling integration with financial managementSummary: strategic modeling data integration with financial management Content (please ensure you mask any confidential information) How can I upload data from Strategic…
-
Product specifications for handling "0" data when exporting Planning data to a CSV file using DIWhat are the product specifications for handling "0" data when exporting Planning data to a CSV file using Data Integration? By setting the application category to "Data…
-
HCM EPBCS Metadata Extract Not Pulling All EmployeesCross-posting from the HCM Extracts forum since I got no traction there, nor with the SR I created afterwards to look into this…. We are using the OOTB HCM Extract to EP…
-
Multiple Budget Control Application not Getting registered on EPM Data ExchangeHello Experts, We want to writeback data to 4 different control budget with 4 different ledger. When we are trying to register budgetary control application on EPM Data …
-
how to extract Integration period in EPM Agent using GroovySummary: I am trying to extract the period for which that integration has executed , Content (please ensure you mask any confidential information): Version (include the …
-
Integrating EPM Planning Cloud with PostgreSQLSummary Blog Post - Integrating EPM Planning Cloud with PostgreSQLContent Hi, This post shows how to use EPM Agent to connect EPM Planning Cloud to a PostgreSQL database…
-
Pre-built Integration between Fusion Fixed Assets and Oracle Planning Cloud Capital ModuleSummary Is Pre-built Integration between Fusion Fixed Assets and Oracle Planning Cloud Capital Module Available?Content Greetings, I am using Oracle Planning Cloud and w…
-
Data workbench export to excel optionSummary: I tried to export workbench data to excel Content (please ensure you mask any confidential information): I have received a requirement from a user to export wor…
-
Business Rule in Pipeline Executes Only for One Year Instead of All Years in RangeSummary: We configured a Data Integration pipeline to run over multiple years (e.g., FY23 to FY25) with a Business Rule job type that runs a Calculation Manager rule. Ac…
-
Data Push from CAPEX to FS Cube is not workingSummary: Although I'm doing exactly the steps mentioned in the tutorial (https://docs.oracle.com/en/cloud/saas/planning-budgeting-cloud/capital-tutorial-integrating-fina…
-
EPM Pipeline: Running a business rule with runtime prompt type SmartlistSummary: Hi, I'm trying to execute the BR: "OWP_Process Loaded Data" as part of a pipeline. I want to pass the variable "OEP_FcstMnth" as the RTP 'Month'. However, Month…
-
Is there a way to automate Data Map Synchronization?Content Hi, We have some automated processes that update metadata in Planning, Load data to BSO and push it to Reporting ASO using Data Maps. But whenever metadata updat…
-
Maximum Number of Explicit Mapping Creating in Data Management using fileSummary: Maximum limit of creating Explicit Mapping in Data Management Content (please ensure you mask any confidential information): Hi!!, What is the Maximum row Limit…
-
Budget Revision without Budgetary ControlSummary: Need: identify which configuration to check that specifically looks for the integration with Budgetary Control Any whitepaper for setting up EPM Budget Revision…