Report Bulk WO Operation transaction with ERESSummary: Report Bulk WO Operation transaction with ERES Content (required): Hello Experts, In our current business scenario, we have implemented ERES for WO Operation tr…
-
Assembly DismantleSummary: Content (required): Hello Friends User is creating a Finished Goods (FG) by using 5 different components. Once Finished Goods comes to inventory, inspector reje…
-
Unable to Disassociate serial number of serial status completed from work orderSummary: In fusion manufacturing, we have work orders for serial tracked manufacturing. Under serial number tab serial number has been generated, material issued, and op…
-
How to return unused items to inventory that are purchased from a work orderSummary: We want to know if there's a way in which the items that are purchased from work order in work order destination can be returned to inventory Content (required)…
-
Not able to return the receipt for Outside Processing Supplier OperationsSummary: We are testing Back-to-Back Sales Order (Make) flow with Consecutive Supplier Operations in the work order for a customer demo due shortly. At the last supplier…
-
Add/Replace the Print Pick Slip Report from Work Order Release PageSummary: While performing Release and Pick action on a work order, the system calls the "Movement Request Pick Slip report" but we would like to Add or Replace another r…
-
Discrete Manufacturing Setup and transaction documentSummary: Kindly provide the Discrete Manufacturing Setup and transaction flow white paper document/user manual document. Content (required): Oracle Fusion Cloud Applicat…
-
There is no restriction on work order validity i.e completion dateSummary: There is no restriction on work order validity, once work order completion date is achieved system should not allow further work order transaction to happen for…
-
How to schedule parallel work order operations on the same Work OrderSummary: There is a need to work on multiple operations on the work order in parallel. Is there a way to do it? Content (required): There is a need to work on multiple o…
-
Print component list from dispatch listSummary: Is there an option to print the work order components list from the dispatch list screen Content (required): Is the a configuration that allows adding work orde…
-
Unable to do OSP for Steel Plate Items as Steel Plate UOM is different than OSP Labour ChargesSummary: We are trying to implement OSP Process for Steel Operation; where Steel Coils are getting Cut into different Sizes Steel Plates by outside Vendors. Those Steel …
-
disable count point flagSummary: Hi We need to disable the count point flag in standard operations. Is there a way to do so Content (required): Version (include the version you are using, if ap…
-
How to automatically backflush Assembly pull components through Rest API for orderless transactionsSummary: How to automatically backflush for Assembly pull components through Rest API? Content (required): We have a requirement where we have non-lot-controlled compone…
-
Report Material Transaction on Work order needs to restrict users within a specific toleranceSummary: Report Material Transaction on Work order needs to restrict users within a specific tolerance Content (required): There is a need to restrict the shopfloor user…
-
costing batch output size modifySummary: Hi We have a scenario wherein the costing batch output size for all work definitions is null currently. However we want to modify this for all WDs but there is …
-
Is there a way to return material issued to the work order at multiple operations in a single goSummary: Before a work is cancelled the customer wants to be able to reverse all material issues done to the work order. Content (required): Because high valued componen…
-
How to stop serial generation when Work Order is created in a back to back processSummary: How to stop auto serial generation when Work Order is created in a back to back process. Content (required): When the Work order is created manually the Serial …
-
How do we populate the sales order on document number field in WESummary: Hi, Kindly help. We have an SO created in org1 and based on the sourcing rule, the item needs to be manufactured in org2 that gets shipped to org1 and the SO is…
-
Mass edit work ordersSummary: Kindly let me know how do we mass edit work orders from Manage Work Orders UI. In our business, we have only B2B orders. So, when user queries the list of work …
-
Not able to see substitute item option on discrete manufacturing work orderSummary: Hi, I'm not able to see substitute option on discrete manufacturing work order. Content (required): Hi, I've defined a substitute item on item structure and sam…
-
BOM modification in PIM, the WD should update itself automatically.Summary: In the WD, there is the BOM, when we have a BOM modification in PIM, the WD should update itself automatically. Content (required): Version (include the version…
-
Can a new resource type be created?Summary: Can a new resource type be created? Content (required): Supply Chain Execution - Work Definition - Manage Resources Resource Type - can be Labor or Equipment. C…
-
What are the Alternatives For Digital Work Instructions in ManufacturingSummary: Content (required): Version (include the version you are using, if applicable): Code Snippet (add any code snippets that support your topic, if applicable):
-
Capture & Flow Project Details in TO, WO, SO & PO for Oracle Fusion in Project Driven Supply ChainSummary: We want to capture & flow Project Details in TO, WO, SO & PO for Oracle Fusion in Project Driven Supply Chain. Wanted to understand if enabling Project Driven S…
-
Smart Meter InstallationHi, I'm not sure if this is the correct group for this question. We have a client who's main business is installation of smart meters. They'd like a system implemented t…
-
We would like to update Lot status for orderless completions through REST APISummary: We would like to update Lot status for orderless completions through REST API Content (required): We have a scenario while performing orderless completions for …
-
Can we reopen a closed work order when the costing period is still open?Summary: Due to some issues on the planning , we had duplicate work orders generated in the system. Users from shop floor have completed without realizing it and compone…
-
How to provide Lot DFF's during work orderless completion while entering completion LotsSummary: We have created Descriptive flexfields in "Maintain Lot Numbers" flexfield but while we are performing work orderless completions we are unable to find Lot DFF'…SK Kousar Sulthana 23 views 2 comments 0 points Most recent by Prasanth Senthivel-Oracle Manufacturing
-
Can I use a phantom item that lists both output and input items in a process work definition?Summary: Use a phantom item that lists both output and input items in a process work definition Content (required): Use case: client needs to define multiple output prod…
-
What is the logic to update Due date at WO in Reservation window?Hello Team , We are trying to update the SSD and RSD (Request Shipped date) at sales order, and we are expecting to make the changes in back-to-back WO Due date in reser…