Category 162
Discussion List
-
FBDI Import Custom Cost Data for Reference (Time Independent)Summary: We have the requriement to Import custom Cost data for reporting purpose at Item level. Content (required): Hi Team, Client want to import custom cost data at i…Nitin.Joshi 2 views 1 comment 0 points Most recent by Sebastian Thomas Supply Chain Planning and Collaboration
-
Stage Table Data in Fusion - ConcernSummary: Hi Team, We have a report which populates all the errors from staging table that are available in staging after FBDI load. Recently we noticed that the report s…Ashish A Jha 34 views 3 comments 0 points Most recent by Avinash Erande Supply Chain Planning and Collaboration
-
How To Generate Rough Cut Capacity Plan in Supply Planning Without Demand InputSummary: Is it possible to Generate Rough Cut Capacity Plan in Fusion Supply Planning Without Demand Input. Requirement is for the system to give my total capacity witho…Gajanan_M 32 views 4 comments 0 points Most recent by Gajanan_M Supply Chain Planning and Collaboration
-
How does the Supply Planning generates a planned order if no sourcing rule exists for an item?Summary: Content (required): We have observed that in case if the item is MRP Planned and there is no sourcing rule defined for the the item still the Supply Plan sugges…Sumit_99 84 views 4 comments 0 points Most recent by A Jansen Supply Chain Planning and Collaboration
-
Phase in and Phase OutSummary: I am a planning Practicing consultant Our client wants a Product Life cycle management (PLM) feature. Business Looking for Phase-in and Phase-out functionality.…
-
How to Populate Ship data at Purchase Requisition Line level in EBSSummary: Wea are implementing standalone supply Chain planning cloud. Source system is EBS. Business wants to see the ship date at requisition line level when we release…BBANDHU 41 views 1 comment 0 points Most recent by Satwik Kumar Patel-Oracle Supply Chain Planning and Collaboration
-
Quick way to select multiple values for Category attribute in Product dimension of segment criteriaSummary: Content (required): Hi, In Replenishment Planning module, under 'Manage Segment Groups and Criteria', we have created a segmentation with two segments containin…Kowsambi Komaravolu 22 views 2 comments 0 points Most recent by Kowsambi Komaravolu Supply Chain Planning and Collaboration
-
Export All Planning Measures with Configuration detailsSummary: Export All Planning Measures with Configuration details Content (required): Hi Experts, Is there a way to Export All Planning Measures with their Configuration …Avinash Erande 22 views 5 comments 0 points Most recent by Avinash Erande Supply Chain Planning and Collaboration
-
Can we create a DFF in backlog management to capture commentsSummary: Can we create a DFF in backlog management to capture comments Content (required): Version (include the version you are using, if applicable): Code Snippet (add …Saroj Maharana 11 views 1 comment 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
New Product Supply Plan and work orderSummary: New Product which are in Prototype life cycle phase would need to be both demand and supply planned with work orders for product development. Content (required)…Suprakash1 Rath 43 views 4 comments 0 points Most recent by Suprakash1 Rath Supply Chain Planning and Collaboration
-
Administer Planning SecuritySummary: Content (required): Dear Experts Please suggest how to configure Administer Planning Security for below scenario. There are two planners P1 and P2 in same Org 1…Ashish_Kumar 85 views 2 comments 0 points Most recent by RakeshOracle-Oracle Supply Chain Planning and Collaboration
-
Weighted by another measure not working with Aggregate and calculate option.We have defined a custom measure to calculate MAPE which is with aggregate and calculate aggregation parameter. And it is defined with Weighted average of Sales history.…Avinash Erande 21 views 1 comment 0 points Most recent by Avinash Erande Supply Chain Planning and Collaboration
-
After enabling the new Opt-in feature "Reauthenticate E-Signature Users Using Oracle Access Manager"Summary: After enabling the new Opt-in feature "Reauthenticate E-Signature Users Using Oracle Access Manager", we have found it still use the Oracle username/password ra…Josh Sparks-Oracle 23 views 1 comment 0 points Most recent by Josh Sparks-Oracle Supply Chain Planning and Collaboration
-
In Demand Plan output, the Measure value should be rounded valueSummary: Hi Team Please find the below steps We tried to upload the measure data in demand planning The Measure value should have 5 decimal values as configured in the M…Sunil Aggarwal 31 views 1 comment 0 points Most recent by RakeshOracle-Oracle Supply Chain Planning and Collaboration
-
Planning view only role for Sales RepresentativeSummary: Is there any Planning view only role for Sales Representative Content (required): Version (include the version you are using, if applicable): Code Snippet (add …Saroj Maharana 21 views 2 comments 0 points Most recent by RakeshOracle-Oracle Supply Chain Planning and Collaboration
-
Data loaded at aggregate level in a custom measure not disaggregating to lowest levelSummary: Unable to get measure data loaded at aggregate level to disaggregate to lowest level Content (required): Hi, I have created a custom measure with aggregation le…Asish Govinda 23 views 1 comment 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
How to generate Manufacturing Work order through Planning module.Summary: We required end to end Vedio or White Paper documents for Work order generate through Planning Content (required): Please provide me White Paper documents or an…Kaushal Gathani 21 views 1 comment 0 points Most recent by Prateek_16-Oracle Supply Chain Planning and Collaboration
-
Does GOP autoschedule REST API update the demand to Cloud GOP when Sales Order is not available?Summary: Hi Team , Our business requirement is we have Order Management in EBS where we are creating the Sales Order and Supply & demand is in Cloud. We have custom inte…
-
How to default "Transaction Subtype" field based on the Item in Report Orderless Completion page?Summary: We have a client requirement to default "Transaction Subtype" field based on the item in "Report Orderless Completion" page. Once user selects the item in repor…Nagendrababu Kanuru 21 views 2 comments 0 points Most recent by Nagendrababu Kanuru Supply Chain Planning and Collaboration
-
How to delete External Forecast from supply planSummary: We have loaded forecast which is in future due date, and now business wants it to be deleted from Supply Plan. Content (required): Please suggest the work aroun…Janaki Ram Nalla 95 views 2 comments 0 points Most recent by RakeshOracle-Oracle Supply Chain Planning and Collaboration
-
Freezing forecast for a defined period to avoid user overridesSummary: Freeze the first 2 month of forecast from user override Content (required): We have a requirement to freeze the forecast override for the first 2 months. So we …Shagaf Hasnain-Oracle 52 views 4 comments 0 points Most recent by RakeshOracle-Oracle Supply Chain Planning and Collaboration
-
The Service PR/PO is not getting created when the Service Item UOM is different than the FG UOMSummary: The Service PR/PO is not getting created and is getting stuck in Supply Chain Orchestration when the Service Item UOM is different than the contract Manufacturi…Manojj Basetti-Oracle 32 views 2 comments 0 points Most recent by Manojj Basetti-Oracle Supply Chain Planning and Collaboration
-
Are there FBDI and REST API's to create sourcing rules so we may automate sourcing rule creation?Summary: Content (required): We are looking for examples and documenation of FBDI and REST API's to create sourcing rules so we may automate sourcing rule creation? Vers…Josh Sparks-Oracle 31 views 1 comment 0 points Most recent by Vikash Tiwary Supply Chain Planning and Collaboration
-
Is there any option to publish the Rescheduled Purchase Order data or supplies & demand dataSummary: Is there any option to publish the Rescheduled Purchase Order data or supplies and demand data from Supply Plan We want the details of the Purchase Orders Resch…Priya.George 31 views 1 comment 0 points Most recent by Vikash Tiwary Supply Chain Planning and Collaboration
-
How to extract bulk data from MSC_REGIONS table using BICCSummary: There are 81,03,282 records in MSC_REGIONS table which is not achievable to extract all the data in a single file using BIP reports due to the following error -…Shanti D 51 views 1 comment 0 points Most recent by Raj C -Oracle Supply Chain Planning and Collaboration
-
what is the impact of adding another year today?Summary: what is the impact of adding another year today? we can't see the 2024 months in our planning screen. Content (required): How can we add 2024 months in attached…Aasawari Gharat 11 views 1 comment 0 points Most recent by Thierry Lamote Supply Chain Planning and Collaboration
-
How can I change the owner of a table in OSCP?Summary: I want to change the owner of a table created in OSCP, is there any way to do it? Content (required): Version (include the version you are using, if applicable)…Hector zacarias 41 views 2 comments 0 points Most recent by Scott Malcolm-Oracle Supply Chain Planning and Collaboration
-
How to prevent External Forecast upload (via FBDI) in a specific organizationSummary: How to prevent External Forecast upload (via FBDI) in a specific organization Content (required): Let's say we have 3 different organizations (A, B, C) availabl…SCMLEAD_AA 41 views 6 comments 0 points Most recent by RakeshOracle-Oracle Supply Chain Planning and Collaboration
-
WO quantity released from Planning in decimal values. with shrinkage factorSummary: Customer had a business requirement to use Shrinkage factor and generate a supply plan order. With this he had defined a shrinkage factor, and this is creating …Manojj Basetti-Oracle 61 views 4 comments 0 points Most recent by Thierry Lamote Supply Chain Planning and Collaboration
-
Backlog Management Item Availability date doesn't align with Supplies/Demands Material AvailableDateSummary: Issue: The "Backlog Management" "Item Availability Dates" doesn't align with the linked Supply Plan's "Material Availability Dates" found in the "Supplies and D…Catherine Alequin 71 views 2 comments 0 points Most recent by Catherine Alequin Supply Chain Planning and Collaboration