Filtering resources based on assigned work zones
Summary
Identifying resources located outside of a bucket, but with temporary work zones assigned for that bucketContent
With the introduction of functionality to assign temporary work zones to resources and the "use resources outside the capacity area" feature, it is now possible for a resource to contribute minutes to a different bucket in the resource tree to the one they are visibly located within.
We are looking at trailing this functionality, and we need to ensure that our dispatch teams can see resources that they are able to assign activities in any work zone within a bucket, regardless of their position in the resource tree. This would include resources able to be assigned work in multiple buckets at the same time, or where they will be moving buckets in the future but we need to plan their work in the new bucket before they move.