Will integration migration override existing connection configuration?
Summary
Will integration migration override existing connection configuration?Content
We have built a few integrations in OIC TEST instance and migrated into OIC Production instance, after migration we re-configured the connections(Fusion ERP Cloud connection) to point to Fusion ERP production instance and activated/scheduled the integrations.
Now we have built more integrations in OIC TEST instance and planning to migrate them as well. Since these are using the same ERP Cloud connection, which is point to ERP Cloud TEST in OIC TEST, if we export the integration from OIC TEST and import into OIC Production, will the existing ERP Cloud connection(configured already to EPR Cloud Production) configuration in OIC Production be override and need to be re-configured?
Tagged:
0