Material issued at one rev, Returned at another.
Summary
Material was issued in older revision and wen we returned the material it by default took the current effective revisionContent
The Situation is we had on hand stock for a item in older revision and the current revision was something else. When the work order was released the materials were issued in the older revision and when we did the returned a item it by default took the current effective revision.
Ask : Is there a way we can default the item revision when we return the item.
The field is editable and we can manually change the revision, but is it possible to have it done automatically.