Best way to pause/resume specific multiple integrations
Summary
Best way to pause/resume specific multiple integrationsContent
Hi,
I have 100+ integrations overall. Out of these, say 50 integrations are linked to Oracle Fusion ERP.
In the event of patching/cloning of Oracle Fusion ERP cloud, I need to pause ONLY the OIC integration to Fusion Cloud (i.e. those 50 integrations out of a total of 100).
Once the patching/clone on Fusion cloud is completed, I would like to resume all those integrations to Fusion Cloud.
What is the best way to do so automatically? Is there any API that can be used where I can pass the interface ID of all the integrations that are to be paused (and later resumed)?
Tagged:
0