Can we force Requisitions to validate that the "End Date" field is on or after the "Start Date"?
Summary:
To avoid manual errors, user needs the Requsition lline flexfield "End date" - ATTRIBUTE_DATE2 is depedent of the value entered in "Start date" ATTRIBUTE_DATE1 as shown in the attached file, in the way that End Date is always forced to be greater than Start date. Flexfield Code: POR_REQUISITION_LINES
Is that possible?
Content (required):
Version (include the version you are using, if applicable):
Oracle Cloud Application 21D (11.13.21.10.0)
Code Snippet (add any code snippets that support your topic, if applicable):
Tagged:
0