Is there a way to submit a payroll flow after checking that other flows have completed?
Summary:Our business case is that we have 2 flows that run at the same time. One loads the absence data files and the other loads the time files. They obviously finish at different times. We have a third flow that requires these 2 to be completed before it can be submitted as it relies on the data from both to do its calculations. Is there a way to schedule the third one to automatically submit once the other 2 have completed? These run late into the night sometimes and it requires that someone stays up
Tagged:
0